<body><script type="text/javascript"> function setAttributeOnload(object, attribute, val) { if(window.addEventListener) { window.addEventListener('load', function(){ object[attribute] = val; }, false); } else { window.attachEvent('onload', function(){ object[attribute] = val; }); } } </script> <div id="navbar-iframe-container"></div> <script type="text/javascript" src="https://apis.google.com/js/platform.js"></script> <script type="text/javascript"> gapi.load("gapi.iframes:gapi.iframes.style.bubble", function() { if (gapi.iframes && gapi.iframes.getContext) { gapi.iframes.getContext().openChild({ url: 'https://www.blogger.com/navbar.g?targetBlogID\x3d33368090\x26blogName\x3dRiding+on+Red+Bricks\x26publishMode\x3dPUBLISH_MODE_BLOGSPOT\x26navbarType\x3dTAN\x26layoutType\x3dCLASSIC\x26searchRoot\x3dhttps://zelevol.blogspot.com/search\x26blogLocale\x3den_US\x26v\x3d2\x26homepageUrl\x3dhttp://zelevol.blogspot.com/\x26vt\x3d-4822663890936199781', where: document.getElementById("navbar-iframe-container"), id: "navbar-iframe", messageHandlersFilter: gapi.iframes.CROSS_ORIGIN_IFRAMES_FILTER, messageHandlers: { 'blogger-ping': function() {} } }); } }); </script>

Riding on Red Bricks

A blog by a Singaporean architecture student which began during his exchange in Delft, Netherlands but continued upon returning...

Recommendations

  • My Flickr
  • Cheewee's Blog
  • Cheryl's Exchange Blog
  • Elita's Photo Album
  • Ju's Blog
  • Johnny's Blog
  • Kexiang's Blog
  • My Nephew's Pics
  • Quotes

    "The word 'politics' is derived from the word 'poly', which means many, and 'ticks', which are blood sucking parasites."

    "Architecture critics are like eunuchs... They know, but they cannot."

    www.flickr.com
    This is a Flickr badge showing public photos from Zelevol. Make your own badge here.

    Archives

    Renovation Pictures...

    Here's a brief account of the renovation process, which started a couple of months ago.

    Mischievous Mrs Kho decided to vandalize the place before the contractor starts their work, just for the fun of it... so I took a couple of spray paint from Maria to work on our short-lived graffiti wall.




    The following week, all that were not supposed to be around weren't around anymore. They include the Master bathroom toilet wall, separating wall between Master and bedroom 1, Store wall, kitchen wall and windows... Now that I've listed them down, we really did some major hacking work!



    After that we started to add the little nibs here and there, as well as some tiling works. The short little wall separates the wardrobe from the master bathroom vanity counter... Above, the kitchen tiles were removed (and later to be made level with the living room, then re-tiled)



    450x900 homogeneous floor tiles, to be used in the kitchen and bedrooms in a running bond pattern which I later learnt to regret due to the inherent warping in the tile (which is more common for large pieces beyond 300x600). There's some unevenness and somewhat larger grout lines in between. Still, I prefer the pattern to a normal stack bond :)

    We bought our sanitary wares / fittings from Adamas, along Jalan Besar. Space constraint in the bathrooms really limited our choices for WCs. We need one with minimum length, and preferably one where the cover conceals the seat entirely cause we had to keep the WC within the shower area prone to wetness. This one we found comes with soft closing for the toilet seat cover...


    Shifting the main door outward to the recess area, which the previous owner bought but did nothing with. So we built up a brick wall on both sides. The contractor also gotten a permit to saw away the hollow pipe railing that extends into the recess area. We'll then seal the gap with a simple casement window.


    Kitchen and bathroom tiles are being laid. We bought our tiles from the clearance section from Builders Shop. The contractor did mention to us Stile is really quite a higher end brand... we visited the tile shops lining Balestier road but we didn't really like any of the tiles there. So...

    Lights we took from Lightcraft. Great service!!! The person we liaised with was very obliging and gave us a very good price. Below is the entrance light that we chose, one of the shortest but most expensive... but there remaining lights we chose were mostly T5s and simple fluorescents.

    The niche at the entrance. There was a bulge in the existing concrete wall, which we originally wanted to expose, with all the services pipes that were coming into the unit from the corridor. So... we then decided to box them all up, and did a little niche for framed photographs and a ledge to be filled with loose pebbles for our keys. Below: the opposite side of the entrance area, painted "Maldives Sand" by Nippon. We're doing some shoe cabinets there, shelves for the hamsters and a low seating with a short planter...



    Above: Living room, also in Maldives Sand, where we will do a TV console... I like how the light strips turned out in the ceiling... I guess it was the right move to do a ceiling in the living area, so that we can conceal all the services and incorporate the lighting within it... They run parallel to the stainless steel joint lines that were embedded on the ground for the screed flooring.

    Also quite glad with how the a/c in the living room turned out. Originally I wanted to squeeze the FCU into the corner of the feature wall above the door, but we were later told by the a/c supplier it was not possible. I was having a tough time trying to run the services properly without showing too much a/c drainage pipes, etc. And the only people who were keen on having an a/c in living room were Chet and YQ >.<>

    Below: Chet chose the colour "Love" from the Nippon catalogue. We're gonna turn it into a feature wall for some of our photos.



    Common bathroom, with grey tiles and painted blue.

    Master Bathroom, with grey tiles painted lime green >.<>



    Lastly, Bobby from Wah Sheng... we're extremely glad he's our contractor... He's got a major part to play for how the house has turned out, as far as wet works are concerned... Cabinetry works are in progress starting with the Kitchen. Hopefully it complements the spaces nicely...